Petrol Filling Station, A1 Dromore Road, Banbridge (Banbridge Coachworks)
Client: Sean Devine Construction
Project Description:
Planning permission was obtained for a Petrol Filling Station and Shop and demolition of the existing coachworks building.
Carey Consulting was responsible for the detailed civil engineering design of the new access which incorporated new de-celeration and acceleration lanes off and onto the dual carriageway and negotiations with Translink regarding the re-location of a nearby bus stop.